MidAmerican Energy Company Logo


Overview

My Web Account

Payment Options

Gift Certificates

About Our Bill

Meter Reading

Automated Meter Reading

Overview

Billing

Customer Benefits

Installation

Meter Reads and AMR

How To Read Meters

Practice Reading Meters

2008 Meter Read Schedule

2009 Meter Read Schedule

Budget Billing

Summary Billing

Request for Services

Customer News

Energy Assistance

Help Your Neighbor

Life Support Registry

For Your Business

Automated Meter Reading
Installation Questions and Answers


View an August 2007 television news story about automated meter reading.

Prior to Installation
Should I schedule a time for my meters to be exchanged?
Appointments are needed only for customers whose meters were not accessible when the MidAmerican Energy hired contractor was working in the area. If access is needed at your location, a door hanger will be left with a phone number for you to call for an appointment.

Do I need to be present when the automated meter reading technology is installed?
We will need access to your meters, and you will need to be present if your meters are inside. If your meters are outside and accessible, you do not need to be present. However, if you usually leave a gate unlocked or keep pets inside during regularly scheduled meter readings, you should do the same when the installer is in your area.

I already have a meter that MidAmerican reads remotely; does my meter(s) still need changed?
You will be notified if your meter(s) will be changed.

During Installation
What if I am not present while the installation takes place?
If you are not present, a door hanger will be left letting you know the replacement was completed. If the installation was not completed, a door hanger will be left with additional instructions. Please use the number on the door hanger to make arrangements for the contractor to come back to your property.

If I am present when the contractor arrives, will I be notified before the installation takes place?
The contractor will attempt to notify you before working on the meter(s).

What time of the day will the meter exchanges/updates take place?
The majority of the meter exchanges/updates will occur Monday through Saturday between 7 a.m. and dusk.

How long will the installation take?
The installation process takes between 5 and 30 minutes per meter. However, if access to your meter(s) is (are) blocked by landscaping or any other type of obstruction, it could take longer.

Who will install the automated meter reading technology, and how will the installer be identified?
MidAmerican has hired contractors to install the necessary equipment to update your meter(s) with automated meter reading technology. The contractors will have both MidAmerican contractor identification and identification from their own company.

What work will the installers be doing?
Almost all of MidAmerican’s residential and commercial meters will be replaced or updated to accommodate automated meter reading technology. The new electric meters will have a digital display instead of traditional dials. For the majority of MidAmerican’s customers, the existing natural gas meter will look nearly identical to traditional dials, but with a transmitting device installed. There are some types of natural gas meters that cannot be updated with the new transmitting device. Those meters will be replaced.

I have electric service with MidAmerican. Will my power go out during the installation?
Yes, there will be a brief power outage when your electrical meter is replaced.

I have natural gas service with MidAmerican. Will I have a gas service interruption during the installation?
Adding automated meter reading technology to an existing gas meter will not interrupt your gas service. If the existing gas meter must be replaced to accommodate the new technology, gas service will be interrupted. If this is the case and you are not present, a door hanger will be left with additional instructions.

After Installation
How will I know if my meter has been exchanged and/or updated?
If no one is present at the property when the work is done, a door hanger will be left letting you know whether the replacement was completed. If it was not completed, additional instructions will be listed on the door hanger.

Will I have to pay for the device on my gas meter or the new electric meter?
No. You will not be charged for the installation of the automated meter reading technology.







For Your Home | For Your Business | Safety | Rates | Energy Efficiency | Economic Development | Environmental Efforts
About Us | Careers | News Room | Storm Center | Wind Energy | Contact | Streetlight Repair Request | System Outage Watch | Energy Choice | For Contractors | For Landlords |


©2008 MidAmerican Energy Holdings Company. All rights reserved.