| Iowa - Electric |
| Effective Date |
Tariff Sheet No. |
Brief Description |
| 1/2/2008 |
15th
Revised Sheet No. C-1 2nd
Revised Sheet No. C-4.20 6th
Revised Sheet No. S-3 6th
Revised Sheet No. S-4 5th
Revised Sheet No. S-9
|
Reduction
in the AEP Cost Recovery Clause
and Reduction in Residential
Base-Use Rates. |
| 1/21/2008 |
Sub.
2nd Revised Sheet No. 39 3rd Revised Sheet No.
41 2nd
Revised Sheet No. 47 1st Revised Sheet No.
52 1st Revised Sheet No. 55
|
Removes
nonrefundable contribution option
from electric line extensions and
extensive plant additions, as
these will be treated as
refundable advances. |
| 3/10/2008 |
5th
Revised Sheet No. N-2.20
1st Revised Sheet No. N-2.40
1st Revised Sheet No. N-2.60
4th Revised Sheet No. S-2.20
1st Revised Sheet No. S-2.40
1st Revised Sheet No. S-2.60
|
Removes
the availability of 3-phase,
3-wire 240, 208 or 480 volts for
new electric installations. |
| 5/1/2008 |
4th
Revised Sheet No. E-32
|
Extend
service availability to April 30,
2009. |
| 6/1/2008 |
16th Revised Sheet No. C-1
|
Annual reconciliation of recoveries under MidAmerican's
alternate energy producer cost recovery clause. |
| 6/1/2008 |
19th Revised Sheet No. C-3
14th Revised Sheet No. C-3.10
|
Annual reconciliation of energy efficiency
cost recovery factors permitted in 199 I.A.C. Section 35.12. |
| 6/18/2008 |
5th Revised Sheet No. N-9
|
Format change. |